Construction information
Your construction permit
Problems regarding the space you want to build on are not easy to solve. Different factors influence your final decision. A first move could be to draw up a set of requirements that your space must meet considering all requirements, a cost analysis can be made to show you the different options. If you choose to build a new structure, your project is subject to a building permit.
If your project requires an urban development permit, the cooperation of an architect is mandatory. The municipal executive makes a decision on the application for a permit within the peremptory time limit of:
- seventy-five days, if the requested is located in an emancipated municipality, the application for a permit does not require a public inquiry and is not combined with an environmental license.
- one hundred and fifty days, if the requested includes roadwork on which the municipality has decision-making authority.
- one hundred and fifty days, in all other cases.
Energy-saving and sustainable construction
Willy Naessens Industrial Buildings profiles itself as an environmentally conscious construction company by:
- working with structural materials;
- limiting the use of finishing materials;
- choosing materials according to their lifespan;
- taking environmental aspects into account.
- a windproof construction: no uncontrolled ventilation;
- maintaining a low overall insulation level;
- optimizing the façade in function of daylight and summer comfort.
Fireproof construction
Discharge of smoke and heat
Smoke and heat discharge systems allow extreme heat and toxic flue gases to escape through the roof and create smoke-free areas. That is often necessary to ensure a safe and rapid evacuation in the event of fire, while still protecting the construction by limiting its temperature.
If a SHEV system is applicable, we can provide cut-outs in the prefabricated roof elements for smoke shutters where necessary, without jeopardising the overall stability. Concrete frames have an additional use of serving as smoke screens. In most cases, an expensive, external smoke screen can therefore be avoided.
PEB requirements: not your concern
Willy Naessens Industrial Buildings keeps a close eye on the ever stricter PEB requirements. We adjust our systems annually, so that you, as client, can sleep soundly. Our prefabricated insulated wall elements achieve effortlessly a U-value of 0.223 W/m² x K. Therefore, the U-value is well below the standard. With a thicker insulation package, they achieve even lower U-values. Insulating joints between the panels avoid local thermal bridges and ensure air-tightness. The insulating package continues at the corners of the building. Roofs in our prefabricated construction systems achieve effortlessly a U-value of 0.240 W/m² x K.